Get a quote
Drywall · Heraklion, Crete

We build rooms without bricks.

Partitions, suspended ceilings and custom builds in plasterboard. New walls and ceilings, with no rubble and no wet plaster.

  • Partitions
  • Ceilings
  • Hidden lighting
  • Niches
Room with a suspended ceiling, hidden light and spots, built by Kalogerakis Construction
01Ceiling with hidden light
From our jobs

Before and after.

Photos from our own jobs, taken from the same spot. Drag the line.

After: A shipping container becomes a room: a frame, outdoor boards and an opening for glass.
Before: Container
A shipping container becomes a room: a frame, outdoor boards and an opening for glass.
After: Bare steel before. After, straight plasterboard walls and big glass panes.
Before: Container, side
Bare steel before. After, straight plasterboard walls and big glass panes.
After: A steel frame in front of the old timber wall, then boards made for outdoors.
Before: Garden walls
A steel frame in front of the old timber wall, then boards made for outdoors.
Step by step

How a wall goes up.

  1. We measure and mark the line of the wall on the floor and the ceiling.

  2. Tracks top and bottom, studs every 60 cm. The door opening goes in here too.

  3. Cables and pipes run between the studs, and mineral wool goes in for quiet.

  4. The boards are screwed to the frame. Green in bathrooms, pink where fire resistance matters.

  5. Tape and filler on the joints, a sanding, and the wall is ready for paint.

3.60 m2.70 m60 cm12.5 mm12.5 mm12.5 mm
Ready for paintExample: a partition with a door
Why drywall

Less upheaval in your home.

No rubble

No bricks and no wet plaster, so far less mess inside the house.

Faster

No plaster to wait for. The wall can be painted as soon as it is done.

Lighter

Much lighter than a brick wall. Ideal for upper floors and older buildings.

Room for everything

Cables, pipes, insulation and hidden lighting all fit inside the wall.

Steel ceiling frame with the cables, before the boards go on
Ceiling frame, before the boards
Our work

From our recent jobs.

Work and ideas
Hallway with linear light in the wall
Hallway with linear light in the wall
Partitions in an open space
Partitions in an open space
A container becoming a room
A container becoming a room
A stepped ceiling, before paint
A stepped ceiling, before paint
See our work up closeRecent jobs, step by step, on Instagram · @kalogerakis_construction
How it works

From a photo to a finished wall.

  1. 01Show us the space

    A photo and the rough size, through the form or on Instagram.

  2. 02Site visit

    We come over, measure up and tell you what can be done.

  3. 03Quote

    You get a price and a timeline before we start.

  4. 04Build

    We build, tidy up and hand it over ready for paint.

Got a space in mind?

Send us the size and a photo, and we'll talk it through.